欧美一级免费看_欲色视频_久久视精品_成人日韩在线观看_91精品网站_国产欧美日韩视频

行業(yè)資訊

DHK型快速環(huán)鏈電動葫蘆,使用規(guī)則

DHK型快速環(huán)鏈電動葫蘆 ,使用規(guī)則。適用場所設備制造、生產加工、倉儲物流、船塢碼頭等。

快速環(huán)鏈電動葫蘆

1、使用前必須對吊鉤、鏈條、吊銷等部件進行檢查,確認機件完好無損后,方可使用。

2、使用時,必須確認被提升物不得超過產品額定起重量,也不能用兩臺產品同時提升一件物品。

3、提升重物前,起重鏈條應自然垂直懸掛,不得斜吊,雙行起重鏈條產品,下吊鉤嚴禁在兩行鏈中翻轉,重物提升高度不得超過額定起重高度。

4、提升重物時,嚴禁工作人員在重物下面做任何工作或行走。

5、電源電壓,頻率必須符合銘牌上面的規(guī)定,在額定功率下,電壓不得低于額定值的90%。

6、產品應避免雨淋,也不適合于提升有毒、有腐蝕、高溫高壓、易燃易爆的物品,工作環(huán)境應符合:溫度-25℃+40℃,濕度<90°。

7、產品當用于腳手架整體提升時,應有專人安裝、操作,懸掛結束后,應由空載試運行,檢查各連接件、起重鏈、吊鉤等有無異常,確認完好后在使用。掛架前應調整起重鏈條的長度,使掛架后每臺電動葫蘆的起重鏈條的張緊度一致,提升時,應有專人觀察每臺產品,查看腳手架是否與墻體相碰。提升機是否有異常聲音或卡鏈,發(fā)現異常應立即停機檢查,排除故障后,方可使用。

DHK type fast chain electric hoist, rules of use

1. Before use, check the hook, chain, revocation and other parts, and confirm that the parts are intact before use.

2. When using, it must be confirmed that the lifting object shall not exceed the rated lifting weight of the product, and it is not allowed to lift one object with two products at the same time.

3. Before lifting heavy objects, the lifting chain shall be naturally suspended vertically without inclined lifting. Double row lifting chain products are prohibited.

4. When lifting heavy objects, it is strictly prohibited for staff to do any work or walk under the heavy objects.

5. The power supply voltage and frequency must meet the requirements specified on the nameplate, and the voltage shall not be lower than 90% of the rated value at the rated power.

6, the product should avoid the rain, also not suitable for ascension toxic, corrosion, high temperature and high pressure, inflammable and explosive items, work environment should meet: temperature 25 ℃ + 40 ℃, humidity < 90 °.

7. When the product is used for the overall hoisting of the scaffold, it shall be installed and operated by a special person. After the suspension, it shall be carried out no-load test run to check whether there is any abnormality in the connecting parts, lifting chain and lifting hook, etc., and it shall be put into use after being confirmed intact. The length of lifting chain shall be adjusted before the hanger to make the tension of lifting chain of each electric hoist behind the hanger consistent. When lifting, special personnel shall observe each product to check whether the scaffold touches the wall. If there is any abnormal sound or card chain in the elevator, stop the machine to check if there is any abnormal sound or card chain.




主站蜘蛛池模板: 激情综合色综合啪啪五月丁香搜索 | 欧美丰满熟妇xxxx性大屁股 | 久久九九久精品国产免费直播 | 8天堂资源在线 | 国产美女牲交视频 | 中文字字幕码一二区 | 国产欧美激情一区二区三区 | 欧美成人午夜免费福利785 | 97精品国产97久久久久久 | 国产精品扒开做爽爽爽的视频 | 亚洲高清在线不卡中文字幕网 | 久久精品国产99久久久古代 | 久久综合中文字幕一区二区三区 | 青久在线 | 农村乱人伦一区二区 | 欧美色成人tv在线播放 | 国产亚洲美女精品久久久2020 | 青青伊人网 | 国产福利91精品一区二区三区 | 国内揄拍国产精品人妻门事件 | 国产偷倩视频 | 久久综合噜噜激激的五月天 | 国产欧美精品亚洲日本一区 | 中文字幕av无码免费一区 | 久久九九99热这里只有精品 | 久久99毛片免费观看不卡 | 精品午夜一区二区三区在线观看 | 高清国产精品久久久久 | 精品国产乱码久久久久久乱码 | 亚洲无限观看 | 久久久网站亚洲第一 | 2019最新国产不卡a | 成人国产 | 久久综合狠狠综合久久综合88 | 99热这里只有精品5 99热这里只有精品66 | 国产乱人伦av在线无码 | 久久精选视频 | 又粗又大又黄又爽的免费视频 | 亚洲精品天堂一区 | 亚洲国产色图 | 熟女性饥渴一区二区三区 |